Skip to main content
ProDesign Kitchen Bath & Tiles
finished basement with wet bar Perry Hall MD

Basement Remodeling & Finishing in Baltimore, MD

ProDesign finishes and remodels basements in Baltimore City, Baltimore County and Harford County, turning unfinished or outdated space into family rooms, bedrooms with egress windows, bathrooms, wet bars, home offices, gyms, theaters and in-law suites. We handle moisture control, framing, insulation, electrical, plumbing, HVAC, drywall, flooring and permits under one contract. MHIC #156725.

basement bedroom with egress window Baltimore
WHY CHOOSE PRODESIGN

A dry, comfortable, code-approved basement

Basements in Maryland face groundwater, humidity and low ceilings. We start by fixing moisture, then build with materials made for below grade: rigid foam insulation on foundation walls, pressure-treated bottom plates, mold-resistant drywall and waterproof flooring. Every finished basement is permitted and inspected, which protects your resale value.

  • Moisture assessment before we build
  • Permits, inspections and code-compliant egress
  • One contractor for framing, electrical, plumbing, HVAC and finishes
  • Kitchen cabinets, vanities, tile and flooring from our own showroom
  • Financing available
FULL-SCOPE CAPABILITIES

Basement remodeling services

✓

Full basement finishing

from bare concrete to finished living space

✓

Basement renovation

updating paneling, drop ceilings and old carpet

✓

Basement bathrooms

full and half baths with up-flush or sewage ejector pumps

✓

Basement bedrooms

with code-required egress windows and window wells

✓

Wet bars and basement kitchenettes

cabinets, quartz tops, sink, beverage fridge

✓

In-law and accessory dwelling suites

bedroom, bath, kitchenette and separate entry

✓

Home theaters and media rooms

soundproofing, recessed lighting, pre-wiring

✓

Home gyms, playrooms and home offices

✓

Laundry rooms and storage rooms

with built-in cabinets

✓

Basement stairs

new treads, railings and lighting

basement home theater Bel Air

Visit Our Showroom at 7506 Eastern Ave

Compare real samples, finishes and materials in person or request a free in-home measurement across Baltimore City, Baltimore County and Harford County.

BELOW-GRADE ENGINEERING & FINISHES

What goes into a finished basement

Moisture control and waterproofing

Interior drain tile and sump pumps, crack injection, vapor barriers, dehumidifiers and exterior grading coordination. We fix moisture first so your finished basement stays dry.

Framing and insulation

Rigid foam board or closed-cell spray foam on foundation walls, pressure-treated bottom plates, framed walls, soffits to hide ducts and beams.

Ceilings

Drywall ceilings for a finished look, or drop (suspended) ceilings for access to pipes and wiring.

Electrical

Recessed LED lighting, outlets to code, dedicated circuits, panel upgrades, network and TV wiring.

Plumbing

Bathroom rough-ins, ejector and up-flush systems, wet bar sinks, water heater relocation.

HVAC

Duct extensions, return air, mini-split systems and dehumidification.

Basement flooring

SPC luxury vinyl plank (most popular), porcelain tile, engineered hardwood, carpet tile and epoxy.

Egress windows

Code-compliant egress windows and window wells for every basement bedroom.

basement bedroom with egress window Baltimore
STEP-BY-STEP WORKFLOW

Our basement remodeling process

  1. 1

    Free consultation, measurements and moisture check

  2. 2

    Floor plan and design

  3. 3

    Written estimate

  4. 4

    Permit drawings and approval

  5. 5

    Framing, rough plumbing, electrical and HVAC with inspections

  6. 6

    Insulation, drywall, paint, flooring, cabinets and fixtures

  7. 7

    Final inspection and walkthrough

Most basements take 4–8 weeks from start to finish.
BALTIMORE PRICING GUIDE

Basement finishing cost in Baltimore

Basement finishing typically runs $35–$70 per sq ft, depending on finishes. Bathrooms, kitchenettes and egress windows are priced as additions.

COMMON HOMEOWNER QUESTIONS

Basement remodeling FAQ

Yes. Baltimore City, Baltimore County and Harford County require permits for finishing basements, and we handle them.

Yes. If there is no drain below the floor, we use a sewage ejector or up-flush system.

SPC rigid-core luxury vinyl plank is waterproof and the most popular choice.

Yes, with an egress window or door, smoke and CO detectors and enough ceiling height.

Usually 4–8 weeks, including inspections.

We address moisture before finishing, with drainage, sump pumps, sealing and dehumidification as needed.
READY TO START YOUR PROJECT?

Turn your basement into living space. Call (443) 718-1111 for a free consultation.

Showroom: 7506 Eastern Ave, Baltimore, MD 21224 · Maryland Home Improvement Commission (MHIC) #156725

ProDesign Kitchen Bath & Tiles

Legal Name: Pro Design Kitchen & Granite Inc.

Maryland Home Improvement Commission (MHIC) #156725

Showroom Address: 7506 Eastern Ave, Baltimore, MD 21224

Hours: Mon–Fri 9 AM–5 PM; Sat 11 AM–3 PM

Phone: (443) 718-1111 / (443) 503-5966

Email: info@prodesignmd.com

Service Area: Baltimore City, Baltimore County, Harford County, Howard County

Call NowFree Estimate